Ducati 916 rebuild
Wednesday, 2 December 2015
Framed
Dropped frame over the engine and fitted swingarm, linkage and shock
Heads
Finally found time to prepare and build the heads. I had two full sets of rockers from which to select the best eight openers and eight closers, and almost enough opening and closing shims to get the clearances spot on, on the optimum settings.
Checking closers
Checking cam timing
Newer Posts
Older Posts
Home
Subscribe to:
Posts (Atom)